2026 Household Hazardous Waste Days

April 13, 2026

Household Hazardous Waste Days


2026 Collection Events


The Town of St. Johnsbury partners with the Town of Burke to offer four Household Hazardous Waste Days. See below for dates and information.


St. Johnsbury: Saturday, May 16th and Saturday, September 26th.

Burke: Saturday, July 18th, and Saturday, October 17th.


All events will be open from 8:30-9 for CEGs* and 9-1 for St.J and Burke residents.

*CEGs are Conditionally Exempt small Quantity Generators. These are businesses that generate ~220 pounds of HHW or less per month and generate 2.2 pounds or less of acutely hazardous waste per month.


For more information, please visit: https://stjrecycles.com/hazardous-waste/location-and-date-listing/


October 9, 2026
Please be advised that the Select Board meeting originally scheduled for Monday has been moved to Tuesday, October 13, 2026 due to the holiday. The meeting will take place at the regularly scheduled time (6pm) and location (Welcome Center 51 Depot Square).
October 7, 2026
Bay Street 10/07/2026
October 7, 2026
Road Closures Saturday, Oct. 10th
October 2, 2026
The Town of St. Johnsbury Recreation Department has received a Technical Assistance Support Grant from Local Motion and is seeking your feedback. Survey responses will be reviewed by Local Motion staff and used to create conceptual designs that include strategies to improve the connection between the Bay St. corridor/Three Rivers Trailhead Pavilion and the downtown business sector of St. Johnsbury. Local Motion will share preliminary conceptual designs with the community on Sunday, October 11th from 9am-3pm during the Fall for St. Johnsbury festival on Depot Square. Visit the booth to engage with conceptual designs, participate in mini walking and biking audits through the "honking tunnel" connection, and share your feedback. Pedestrians and bikers welcome! (NOTE: Ticket to Ride will offer a bike valet service to safely park your bicycle after your audit so you can explore and enjoy the rest of the festival!)  Following the audits, Local Motion will work over the winter to finalize conceptual designs based on survey and audit results. A full "pop-up" demonstration will be planned for the connection area in Spring/Summer 2027.
By Joe kasprzak • September 14, 2026
Caledonia Food Cooperative VCDP CDBG Public Hearing 09-14-2026
September 10, 2026
Saturday, September 26th, 2026
September 10, 2026
Cemetery Rules & Seasonal Decoration Removal
September 9, 2026
The St. Johnsbury Energy Committee meeting for September has been postponed to September 21st.
September 8, 2026
September 4, 2026
Saturday, September 12th, 2026